- Engineering design
- Development of Basis of Design (BoD)
- Front End Engineering Design (FEED)
- Final Investment Decision (FID) support
- Engineering reliability studies
- Rehabilitation review and execution
- Planning for fecommissioning and rnvironmental consideration
- Disposal of fluid and post removal engineering
- Removal from service and on-going monitoring and maintenance
- Managing liabilities
- Pipeline data / bore-maps
- Design fabrication and installation (DFI) dossier
- Integrated valve as-built
- Major accident prevention document (MAPD)
- Safety critical element support
- Risk Assessment / Failure mode and effects analysis (FMEA)
- Repair method selection
- Live repair and defect assessment
- Leak detection
- 3rd party damage management
- Fitness for purpose (FFP) assessment and life extension services
- Technical notes
- Failure analyses
- Reporting and analysis
- Asset integrity gap analysis
- Integrity validation program
- Performance standard review
- CUI review studies
- CUI philosophy
- CUI mitigation planning
- Pigging offshore logistics management
- Pig cleaning and storage
- Pig damage investigation
- Pig-TMS software
- Project management
- Project work-packs
- Non-routine pigging procedures
- Decommissioning pigging
- Piggability studies and planning
- Pig and pig trap design
- Gap analysis including modifications and assurance
- Technology selection and operational excellence
- Project management
- Project work-packs
- Non-routine pigging procedures
- Technology selection and operational excellence
- Risk Assessment
- Unpiggable pipelines solutions
- Difficult to pig pipelines
- Independent valve integrity
- Root cause analysis
- Live repair and defect assessment
- Historical performance analysis and benchmarking
- Integration of VIMS with operators operating processes
- Development of maximum normal operating pressures
- Development of standard operating procedures
- Review and development of test volumes
- Valves tagging and identification
- Root cause analysis
- Isolation and repair
- Valve stock / spares management strategy
- Reconditioning support
- Development of performance standards
- Review of maintenance plan and recommendation
- Up to 75 % savings in cost
- Reduction in man hours
- Integration with computerised maintenance management systems (CMMS)
- Integration of all operations
- Integration of 3rd party assets
- Quantitative risk management
- Health check status report
- Live risk assessment
- Quality control and assurance
- Ownership of inspection
- Assistant engineering
- Valve leading and lagging indicators
- Failure mode analysis
- Valve reliability and availability calcs
- Automatic trending and data storage
- Unique valve identifier
- Valve OEM data (to component level)
- Historical failure integration
- Global valve failure database
- Valve datasheet
- Operating procedures
- General Operations and Maintenance
- Operations, Mechanical, Electrical and Instrumentation
- Fail safe and emergency systems
- Welfare and safety facilities
- Utilities and control systems
- Security, Medical and First Aid support
- Logistics Support Services
- Emergency drills and communications
- Minor and major incidents
- Collision or structural failure
- Boarding after a major incident
- Oil clean-up and recovery
- Serious injury or illness
- Pipeline emergency response
- SC elements and equipment performance standards
- Maintenance strategies
- Master equipment list
- SILS and HAZOPs
- Job plans
- Point based criticality
- Total competence tool
- Asset register
- Fundamental risk assessments
- Corrosion threats assessment
- Safety case and MAPD
- Safe operating limits
- Incident reporting and actions