Execution of the Asset Integrity and Maintenance Service Contract for OML 29
- 11 gas pipelines (1 not operational)
- 9 oil delivery lines (1 abandoned, 1 not-operational, 1 disused)
- 6 oil trunk lines (3 disused pipelines)
- 153 wells drilled
- Asset design capacity of 240,000 bopd
- Asset production @2013 was 64,112 bopd
- Operating at only 27 % of design capacity